Tag No.: K0012

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph ' s it was noted that the facility failed to ensure that fire proofing for structural steel was maintained.
During the survey between 8 AM and 4 PM it was observed that the spray on fire proofing had been damaged in the 5th floor west mechanical room.
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0018

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that all patient room doors closed and latched properly.
During the survey between 8 AM and 4 PM it was observed that the door to room 650 needs a positive latching device.
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0023

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that all smoke doors separating the building into smoke compartments were maintained to close properly.
During the survey between 8 AM and 4 PM it was observed that the following smoke doors were in need of adjustment to close properly.
a.) 3rd floor SW corridor at GIDU
b.) 6th floor at east tower
c.) 6th floor at west tower
d.) 4th floor at rooms 478-461
e.) 4th floor at room 471
f.) 4th floor at west tower
g.) 2nd floor at elevator lobby at CICVU
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0029

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that hazardous areas were separated properly.
During the survey between 8 AM and 4 PM it was observed that the following hazardous areas were not separated properly.
a.) electrical room on 7 west, repair fire caulk in conduit.
b.) 3rd floor provide an automatic closer on door for the storage room in Hospitalist area.
c.) 3rd floor mechanical room seal old conduit holes
d.) 3rd floor electrical room seal old conduit holes
e.) 6th floor janitor closet seal holes at ceiling
f.) 4th floor mechanical room holes noted
g.) all soiled utility rooms must have positive latching doors
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0034

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the stairways in the east and west towers met the requirements of the Life Safety Code.
During the survey between 8 AM and 4 PM it was observed that the stairways in the east and west towers have openings that allow a sphere greater than 4 inches to pass through which is greater than allowed.
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0054

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that smoke detectors were installed properly and in all required areas.
During the survey between 8 AM and 4 PM it was observed that the following areas were not protected properly by required smoke detectors.
a.) 7th floor public waiting area in elevator area which is not in view of the nurses ' station is required to have smoke detection provided.
b.) 5th floor Hospitalist sleeping room is required to have a smoke detector powered by the buildings electrical system and having battery backup.
c.) 3rd floor Endoscopy unit patient waiting room which is not in view of the nurses ' station is required to have smoke detection provided.
d.) 4th floor waiting area the smoke detector is located too close to the HVAC diffuser.
e.) 2nd floor pharmacy storeroom detector is located too close to the HVAC diffuser.
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0062

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the sprinkler system was maintained in a reliable working order.
During the survey between 8 AM and 4 PM it was observed that the following sprinkler items were noted.
a.) Boiler room, fire sprinkler riser green tagged but dated 2010
b.) Dry-system riser yellow tagged.
c.) Main air handler area/obstructed fire sprinklers
d.) Material management area/ under electrical conduit & AC Duct.
e.) Exterior dock by gas room/if used for storage needs sprinkler coverage
f.) Main electrical room in dietary/no coverage
g.) Offices in Dietary/ no coverage
h.) Coolers in kitchen area/no coverage
i.) Green room/ sprinklers obstructed
j.) Riser room green tag has 4 different months punched for the same year.
k.) The fire pump room shall be one hour rated construction.
l.) All riser rooms and sprinkler zone valve locations shall be clearly labeled.
m.) Areas throughout the facility had storage
n.) Ensure that the sprinkler system in the penthouse area is in service.
These findings were verified with Saint Joseph's staff members at the time of discovery.

No Description Available

Tag No.: K0147

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the requirements of the National Electrical Code were met.

During the survey between 8 AM and 4 PM it was observed that there were removable power taps and extension cords being used improperly throughout the facility.

These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0012

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph ' s it was noted that the facility failed to ensure that fire proofing for structural steel was maintained.
During the survey between 8 AM and 4 PM it was observed that the spray on fire proofing had been damaged in the 5th floor west mechanical room.
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0018

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that all patient room doors closed and latched properly.
During the survey between 8 AM and 4 PM it was observed that the door to room 650 needs a positive latching device.
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0023

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that all smoke doors separating the building into smoke compartments were maintained to close properly.
During the survey between 8 AM and 4 PM it was observed that the following smoke doors were in need of adjustment to close properly.
a.) 3rd floor SW corridor at GIDU
b.) 6th floor at east tower
c.) 6th floor at west tower
d.) 4th floor at rooms 478-461
e.) 4th floor at room 471
f.) 4th floor at west tower
g.) 2nd floor at elevator lobby at CICVU
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0029

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that hazardous areas were separated properly.
During the survey between 8 AM and 4 PM it was observed that the following hazardous areas were not separated properly.
a.) electrical room on 7 west, repair fire caulk in conduit.
b.) 3rd floor provide an automatic closer on door for the storage room in Hospitalist area.
c.) 3rd floor mechanical room seal old conduit holes
d.) 3rd floor electrical room seal old conduit holes
e.) 6th floor janitor closet seal holes at ceiling
f.) 4th floor mechanical room holes noted
g.) all soiled utility rooms must have positive latching doors
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0034

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the stairways in the east and west towers met the requirements of the Life Safety Code.
During the survey between 8 AM and 4 PM it was observed that the stairways in the east and west towers have openings that allow a sphere greater than 4 inches to pass through which is greater than allowed.
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0054

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that smoke detectors were installed properly and in all required areas.
During the survey between 8 AM and 4 PM it was observed that the following areas were not protected properly by required smoke detectors.
a.) 7th floor public waiting area in elevator area which is not in view of the nurses ' station is required to have smoke detection provided.
b.) 5th floor Hospitalist sleeping room is required to have a smoke detector powered by the buildings electrical system and having battery backup.
c.) 3rd floor Endoscopy unit patient waiting room which is not in view of the nurses ' station is required to have smoke detection provided.
d.) 4th floor waiting area the smoke detector is located too close to the HVAC diffuser.
e.) 2nd floor pharmacy storeroom detector is located too close to the HVAC diffuser.
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0062

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the sprinkler system was maintained in a reliable working order.
During the survey between 8 AM and 4 PM it was observed that the following sprinkler items were noted.
a.) Boiler room, fire sprinkler riser green tagged but dated 2010
b.) Dry-system riser yellow tagged.
c.) Main air handler area/obstructed fire sprinklers
d.) Material management area/ under electrical conduit & AC Duct.
e.) Exterior dock by gas room/if used for storage needs sprinkler coverage
f.) Main electrical room in dietary/no coverage
g.) Offices in Dietary/ no coverage
h.) Coolers in kitchen area/no coverage
i.) Green room/ sprinklers obstructed
j.) Riser room green tag has 4 different months punched for the same year.
k.) The fire pump room shall be one hour rated construction.
l.) All riser rooms and sprinkler zone valve locations shall be clearly labeled.
m.) Areas throughout the facility had storage
n.) Ensure that the sprinkler system in the penthouse area is in service.
These findings were verified with Saint Joseph's staff members at the time of discovery.

LIFE SAFETY CODE STANDARD

Tag No.: K0147

During the tour of the facility conducted by the Fire Marshal's Team accompanied by Staff Members from Saint Joseph's it was noted that the facility failed to ensure that the requirements of the National Electrical Code were met.

During the survey between 8 AM and 4 PM it was observed that there were removable power taps and extension cords being used improperly throughout the facility.