Tag No.: K0914
Based on staff interview and document review, the facility failed to maintain and test their electrical receptacles and systems in accordance with NFPA 99. This deficient practice would affect all patients, visitors, and staff in 3 of 3 smoke zones. The facility has a capacity of 25 and a census of 6 at the time of this survey.
Findings include:
During the tour conduced on 02/13/19, at review of records between 1:00 p.m. and 3:00 p.m., it is revealed:
-- 1. No documented annual receptacle testing within the last 12 months.
Staff M-1 and Staff M-2 were present and acknowledged the results of the records review.
NFPA Standard: NFPA 99 2012 6.3.3.2 Receptacle Testing in Patient Care Rooms 6.3.3.2.1 The physical integrity of each receptacle shall be confirmed by visual inspection. 6.3.3.2.2 The continuity of the grounding circuit in each electrical receptacle shall be verified. 6.3.3.2.3 correct polarity of the hot and neutral connections in each electrical receptacle shall be confirmed. 6.3.4.1 Maintenance and testing of Electrical System 6.3.4.1. 1 Where hospital-grade receptacles are required at patient bed location and in location where deep sedation or general anesthesia is administered, testing shall be performed after initial installation, replacement, or servicing of the device. 6.3.4.1.2 Additional testing of receptacles in patient care rooms shall be performed at intervals defined by documented performance data. 6.3.4.1.3 Receptacles not listed as hospital-grade, at patient bed locations and in locations where deep sedation or general anesthesia is administered, shall be tested at intervals not exceeding 12 months. 6.3.4.1.4 The LIM circuit shall be tested at intervals of not more than 1 month by actuating the LIM test switch (see 6.3.2.6.3.6). For a LIM circuit with automated self-test and self-calibration capabilities, this test shall be performed at intervals of not more than 12 months. Actuation of the test switch shall activate both visual and audible alarm indicators. 6.3.4.1.5 After any repair or renovation to an electrical distribution system, the LIM circuit shall be tested in accordance with 6.3.3.3.2 6.4.4.1.2.1* Circuit Breakers. Main and feeder circuit breakers shall be inspected annually, and a program for periodically exercising the components shall be established according to manufacturer's recommendations. 6.3.4.2.1.1 A record shall be maintained of the tests required by this chapter and associated repairs or modification. 6.3.4.2.1.2 At a minimum, the record shall contain the date, the rooms or areas tested, and an indication of which items have met, or have failed to meet, the performance requirements of this chapter. 6.3.4.2.2 Isolated Power System (Where Installed). A permanent record shall be kept of the results of each of the tests.