Based on observation, on January 12, 2010 at approximately 11:45am onward, the essential electrical system is incomplete due to the following:
a. generator annunciator panel at ER reception area - panel doesn't monitor all malfunctions of the emergency generator as required by NFPA 99. Panel did not indicate emergency power system supplying load during loss of normal power to the Life Safety Branch automatic transfer switch.
b. lack of task lighting with battery backup at the generator set locations.