Tag No.: K0039
Based on observation during the morning of 9/21/12, the 8'-0" wide egress corridor at the north end of the second floor had a cross-corridor glass wall (with one door in it) installed between the patient sleeping rooms and the stairway exit door.
Tag No.: K0052
Based on observation and interview with the Plant Operations employee during the afternoon of 9/20/12, the fire alarm system required maintenance. The "trouble" signal on the main fire alarm control panel was illuminated to indicate a malfunction in the system.
Tag No.: K0039
Based on observation during the morning of 9/21/12, the 8'-0" wide egress corridor at the north end of the second floor had a cross-corridor glass wall (with one door in it) installed between the patient sleeping rooms and the stairway exit door.
Tag No.: K0052
Based on observation and interview with the Plant Operations employee during the afternoon of 9/20/12, the fire alarm system required maintenance. The "trouble" signal on the main fire alarm control panel was illuminated to indicate a malfunction in the system.