Bringing transparency to federal inspections
Tag No.: K0050
Based on document review with maintenance staff, the facility failed to conduct and document the required annual Internal/External disaster drills. These drills increase the knowledge of staff of the action to take in an emergency situation.
The findings include:
During the document review with maintenance staff on 2/11/2013, it was found that the annual Internal and External drills had not been done. "Each organizational entity shall implement two or more (Internal & External) specific responses of the emergency operations plan during each year". According to CMS, drills must be separated by 4 to 7 months. 59A-4.126 & -4.106(5)(c)2, Florida Administrative Code; NFPA 99 (2005) Chapter 12 & 17.3.12
Tag No.: K0061
Based on document review and observation, the facility failed to maintain required supervision of all shut-off valves and water supply for the sprinkler system. Tamper switches notify the facility of any interruption of the water supply to the sprinkler system.
The findings include:
During document review and observation during facility tour on 2/11/2013 at about 12:00pm, with the Director of Maintenance, it was found that the backflow preventer was not supervised with the required tamper switch which are inspected and tested periodically. 19.7.6, 4.6.12, NFPA 13, NFPA 25, 9.7.5
Tag No.: K0144
Based on record review and staff interview, it was determined that the facility failed to properly test and maintain the generator as required as evidenced by the lack of documentation for the annual inspection and 4-hour load bank test. This deficiency could affect all occupants of the facility in case of a fire or other emergency.
Findings include:
During Document review at 10:00 am on 2/11/2013 with the Maintenance Director, it was noticed that there was no documentation for the 4-hour load bank test as required. The Maintenance Director confirmed the findings during the document review. A 4 hour load bank must be performed every 36 months. NFPA 101 (2000), NFPA 99, NFPA 110 8.4.9
Tag No.: K0147
Based on document review and interview with the Director of Maintenance, it was noted that the facility failed to maintain documentation on the exercising of the main and feeder breakers. Not exercising as required by the manufacturer can lead to corrosion among other issues which can cause delay or the inability to transfer power in a time of emergency.
The findings include:
During document review with the Director of Maintenance on 2/11/2013, it was found that the proper documentation for maintenance and testing was not being kept in accordance with NFPA 70, National Electrical Code. 9.1.2 for the exercise of the Main and Feeder Breakers. The Maintenance Director confirmed the findings during an interview on 2/11/13 at approximately 11:00am.
Tag No.: K0050
Based on document review with maintenance staff, the facility failed to conduct and document the required annual Internal/External disaster drills. These drills increase the knowledge of staff of the action to take in an emergency situation.
The findings include:
During the document review with maintenance staff on 2/11/2013, it was found that the annual Internal and External drills had not been done. "Each organizational entity shall implement two or more (Internal & External) specific responses of the emergency operations plan during each year". According to CMS, drills must be separated by 4 to 7 months. 59A-4.126 & -4.106(5)(c)2, Florida Administrative Code; NFPA 99 (2005) Chapter 12 & 17.3.12
Tag No.: K0061
Based on document review and observation, the facility failed to maintain required supervision of all shut-off valves and water supply for the sprinkler system. Tamper switches notify the facility of any interruption of the water supply to the sprinkler system.
The findings include:
During document review and observation during facility tour on 2/11/2013 at about 12:00pm, with the Director of Maintenance, it was found that the backflow preventer was not supervised with the required tamper switch which are inspected and tested periodically. 19.7.6, 4.6.12, NFPA 13, NFPA 25, 9.7.5
Tag No.: K0144
Based on record review and staff interview, it was determined that the facility failed to properly test and maintain the generator as required as evidenced by the lack of documentation for the annual inspection and 4-hour load bank test. This deficiency could affect all occupants of the facility in case of a fire or other emergency.
Findings include:
During Document review at 10:00 am on 2/11/2013 with the Maintenance Director, it was noticed that there was no documentation for the 4-hour load bank test as required. The Maintenance Director confirmed the findings during the document review. A 4 hour load bank must be performed every 36 months. NFPA 101 (2000), NFPA 99, NFPA 110 8.4.9
Tag No.: K0147
Based on document review and interview with the Director of Maintenance, it was noted that the facility failed to maintain documentation on the exercising of the main and feeder breakers. Not exercising as required by the manufacturer can lead to corrosion among other issues which can cause delay or the inability to transfer power in a time of emergency.
The findings include:
During document review with the Director of Maintenance on 2/11/2013, it was found that the proper documentation for maintenance and testing was not being kept in accordance with NFPA 70, National Electrical Code. 9.1.2 for the exercise of the Main and Feeder Breakers. The Maintenance Director confirmed the findings during an interview on 2/11/13 at approximately 11:00am.