Tag No.: K0056
Based on observation and interview, it was determined the facility failed to maintain sprinkler requirements in several instances on one of eight floors.
Findings Include:
Observation on August 9, 2011, revealed the following:
At 11:45 a.m. there was excessive dirt and debris on sprinkler heads throughout the 4th floor west wing.
Interview with the Engineering/Maintenance representative on August 10, 2011, @ 14:00 p.m. confirmed the condition with the sprinkler heads on the 4th floor.
Tag No.: K0067
Based on observation and interview, it was determined the facility failed to maintain HVAC requirements in one instance on one of eight floors.
Findings Include:
Observation on August 10, 2011, at 11:39 am revealed the following:
There were eggcrate ceiling tiles installed in the storage room behind the Memorial Conference Center creating a plenum. Items above the ceiling are not plenum rated.
Interview with the Engineering/Maintenance representative on August 10, 2011, @ 14:00 p.m. confirmed the condition in the storage room.
Tag No.: K0076
Based on observation and interview, it was determined the facility failed to maintain cylinder storage requirements in one instance on one of eight floors.
Findings Include:
Observation on August 10, 2011, @ 10:00 a.m. revealed the following:
There was an unsecured oxygen cylinder on top of some bins outside of the EMS office in the Emergency Room area.
Interview with the Engineering/Maintenance representative on August 10, 2011, @ 14:00 p.m. confirmed the condition with the unsecured cylinder in the E.R. Area.
Tag No.: K0147
Based on observation and interview, it was determined the facility failed to maintain electrical requirements in one instance on one of eight floors.
Findings Include:
Observation on August 09, 2011, @ 13:30 p.m. revealed there were beds and wheelchairs blocking the electrical panels in the 2 west penthouse.