Tag No.: K0056
1. Building #1, the facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have sprinkler coverage or smoke detection in the following areas:
a. 3rd floor bath rooms in the Observation rooms 10 and 11
b. 1st floor Lab, and X-ray area
2. Building #1, Ground floor, near cardiac catheterization
The facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have proper sprinkler coverage in the following area:
There were two sprinkler heads on the same side of the room leaving the opposite side without coverage in an area greater than 500 square feet.
3. Building #1, 1st Floor, Stairwell E-2
Facility at the time of the inspection could not verify the installation of sprinkler heads at the top portion of the vertical shaft accessible from stairwell E-2.
Tag No.: K0056
1. Building #2, Ground Floor Cold Room
The facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have a complete sprinkler system in the 1986 tower in the following areas:
a. The entrance to the cold room has incomplete sprinkler coverage
2. Building #2, Ground Floor, PACU
The facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have a complete sprinkler system in the 1986 tower in the following areas:
a. The PACU does not have 100% sprinkler coverage, and the bathroom in PACU did not have sprinkler coverage or protected with smoke detector.
3. Building #2, Ground Floor, Operating Rooms
The facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have a complete sprinkler system in the 1986 tower in the following areas:
a. The facility operating rooms 1 trough 7 do not have sprinkler coverage.
4. The facility is utilizing special locking systems and is not fully sprinklered as required. The facility doses not have a complete sprinkler system in the 1986 bed tower in the following areas:
a. Bathrooms in the 1986 Tower
b. staff lounge bathrooms near the elevator lobby areas in 1986 tower
c. men and women ' s bathrooms on the 2nd floor near the assistant housekeeping managers office in the 1986 tower