HospitalInspections.org

Bringing transparency to federal inspections

3125 DR RUSSELL SMITH WAY

CARTHAGE, MO 64836

Emergency Lighting

Tag No.: K0291

Based on observation and facility staff interview, facility staff failed to provide emergency lighting not controlled by light switches. This deficient practice has the potential to affect all patients, staff and visitors within the facility. Failure to provide emergency lighting could prevent proper illumination of required areas in the event of power loss. This facility census was 18.

1. Observations on 8/27-28/19, during the Life Safety Code (LSC) tour, showed the following light fixtures in the facility controlled by light switches:

-ED medication room,

-Old ICU Med/surge medication room,

-Med/surge room #1753 Lakeside medication room,

-Infusion medication room,

-Surgery department post OP medication room #1258,

-Recovery medication room.

During an interview on 8/28/2019 at 11:12 A.M., the Maintenance Manager said he/she was unaware the light switches controlled the emergency lights in the medication rooms.

NFPA 99, 2012 edition, section 6.4.2.2.4.2 states:

"6.4.2.2.4.2 The critical branch shall supply power for task illumination,
fixed equipment, select receptacles, and select power
circuits serving the following areas and functions related to patient
care:
(1) Critical care areas that utilize anesthetizing gases, task illumination,
select receptacles, and fixed equipment
(2) Isolated power systems in special environments
(3) Task illumination and select receptacles in the following:
(a) Patient care rooms, including infant nurseries, selected
acute nursing areas, psychiatric bed areas (omit receptacles),
and ward treatment rooms
(b) Medication preparation areas
(c) Pharmacy dispensing areas
(d) Nurses ' stations (unless adequately lighted by corridor
luminaires)
(4) Additional specialized patient care task illumination and
receptacles, where needed
(5) Nurse call systems
(6) Blood, bone, and tissue banks
(7)*Telephone equipment rooms and closets
(8) Task illumination, select receptacles, and select power circuits
for the following areas:
(a) General care beds with at least one duplex receptacle
per patient bedroom, and task illumination as required
by the governing body of the health care facility
(b) Angiographic labs
(c) Cardiac catheterization labs
(d) Coronary care units
(e) Hemodialysis rooms or areas
(f) Emergency room treatment areas (select)
(g) Human physiology labs
(h) Intensive care units
(i) Postoperative recovery rooms (select)
(9) Additional task illumination, receptacles, and select power
circuits needed for effective facility operation, including
single-phase fractional horsepower motors, which are permitted
to be connected to the critical branch"

Sprinkler System - Maintenance and Testing

Tag No.: K0353

Based on record review, facility staff failed to inspect the five wet & one dry sprinkler systems per NFPA 25, Standard for the Inspection, Testing, and maintenance of Water-Based Fire Protection Systems, 2011 edition. The facility census was 18.


1) Record review on 08/27/2019 did not show the following inspections for one dry and 5 wet sprinkler systems:

-five (5) year internal pipe inspections/testing,

-five year check valve interior inspections

Refer to NFPA 25, Standard for the Inspection, Testing, and maintenance of Water-Based Fire Protection Systems, 2011 edition.

13.4.2 Check Valves.
13.4.2.1 Inspection. Valves shall be inspected internally every
5 years to verify that all components operate correctly, move
freely, and are in good condition.

During an interview on 9/06/19 at approximately 12:11 P.M., the facility Maintenance Manager stated he/she started at the facility December 20th, 2018 and did not know the 5 year inspections were not done. Additionally, he/she said he/she started the the process for bids and corporate approval in June 2019 and the inspections were completed 9/04/2019.

Maintenance, Inspection and Testing - Doors

Tag No.: K0761

Based on observation, facility staff interview and record review, facility staff failed to inspect, test and maintain the fire egress doors in accordance with the 2010 Editions of NFPA 80 (Standard for Fire Doors and Other Opening Protectives) and NFPA 105 (Standard for Fire Doors and Other Opening Protectives). Facility staff failed to conduct a comprehensive annual inspection of the non rated doors in the building. The facility census was 18.

1. Review of the facility's inspection records did not show fire and smoke door inspections.

2. Review of the facility's inspection records did not show non rated and corridor door inspections.

During an interview on 08/28/19 at 11:20 A.M., the Maintenance Manager said he/she was unaware the required door inspections needed to be conducted by qualified outside vendors.


NFPA 101, 2012 Edition states:

19.2.2.2.1 Doors complying with 7.2.1 shall be permitted.

7.2.1.15 Inspection of Door Openings.

7.2.1.15.1* Where required by Chapters 11 through 43, the
following door assemblies shall be inspected and tested not
less than annually in accordance with 7.2.1.15.2 through
7.2.1.15.8:
(1) Door leaves equipped with panic hardware or fire exit
hardware in accordance with 7.2.1.7
(2) Door assemblies in exit enclosures
(3) Electrically controlled egress doors
(4) Door assemblies with special locking arrangements subject
to 7.2.1.6

7.2.1.15.2 Fire-rated door assemblies shall be inspected and
tested in accordance with NFPA 80, Standard for Fire Doors and
Other Opening Protectives. Smoke door assemblies shall be inspected
and tested in accordance with NFPA 105, Standard for
Smoke Door Assemblies and Other Opening Protectives.

7.2.1.15.3 The inspection and testing interval for fire-rated
and nonrated door assemblies shall be permitted to exceed 12
months under a written performance-based program in accordance
with 5.2.2 of NFPA 80, Standard for Fire Doors and Other
Opening Protectives.

7.2.1.15.4 A written record of the inspections and testing
shall be signed and kept for inspection by the authority having
jurisdiction.

7.2.1.15.5 Functional testing of door assemblies shall be performed
by individuals who can demonstrate knowledge and
understanding of the operating components of the type of
door being subjected to testing.

7.2.1.15.6 Door assemblies shall be visually inspected from
both sides of the opening to assess the overall condition of the
assembly.

7.2.1.15.7 As a minimum, the following items shall be verified:
(1) Floor space on both sides of the openings is clear of obstructions,
and door leaves open fully and close freely.
(2) Forces required to set door leaves in motion and move to
the fully open position do not exceed the requirements
in 7.2.1.4.5.
(3) Latching and locking devices comply with 7.2.1.5.
(4) Releasing hardware devices are installed in accordance
with 7.2.1.5.10.1.
(5) Door leaves of paired openings are installed in accordance
with 7.2.1.5.11.
(6) Door closers are adjusted properly to control the closing
speed of door leaves in accordance with accessibility requirements.
(7) Projection of door leaves into the path of egress does not
exceed the encroachment permitted by 7.2.1.4.3.
(8) Powered door openings operate in accordance with
7.2.1.9.
(9) Signage required by 7.2.1.4.1(3), 7.2.1.5.5, 7.2.1.6, and
7.2.1.9 is intact and legible.
(10) Door openings with special locking arrangements function
in accordance with 7.2.1.6
(11) Security devices that impede egress are not installed on
openings, as required by 7.2.1.5.12.

19.3.6.3.13 Dutch doors shall be permitted where they conform
to 19.3.6.3 and meet all of the following criteria:
(1) Both the upper leaf and lower leaf are equipped with a
latching device.
(2) The meeting edges of the upper and lower leaves are
equipped with an astragal, a rabbet, or a bevel.
(3) Where protecting openings in enclosures around hazardous
areas, the doors comply with NFPA80, Standard for Fire
Doors and Other Opening Protectives.