Tag No.: K0106

A. By direct observation and staff interview on 01/06/15 at 10:00AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By direct observation and staff interview on 01/06/15 at 10:30AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By direct observation and staff interview on 1/6/15 at 10:15AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By direct observation and staff interview on 01/06/15 at 10:45AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By direct observation and staff interview on 01/06/15 at 9:30AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By direct observation and staff interview on 01/06/15 at 9:45AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. By staff interview on 01/06/15 at 9:00AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0106

A. Corrected July 30, 2015

B. By direct observation and staff interview on 01/06/15 at 11:00AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility failed to provide a Type 1 Essential Electric System (EES) in compliance with NFPA 99, 1999, 3-4. The facility's alternate source of power is a 900 KW diesel generator which has one transfer switch and supplies electricity to the entire facility in the event of a utility outage.

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 10:00AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 10:15AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 10:30AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 10:45AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 11:30AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 9:00AMwhile accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at 9:30AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).

No Description Available

Tag No.: K0145

By direct observation and staff interview on 1/6/15 at :9:45AM while accompanied by the Facility's Chief Engineer the surveyor finds the facility is not divided into the required Emergency System (3-5.2.2.2) and the Critical System (3-5.2.2.3).