Bringing transparency to federal inspections
Tag No.: K0225
Based on observation and interview, it was determined the facility failed to maintain stair tower enclosures in three locations, affecting two of two floors.
Findings include:
1. Observation on May 9, 2023, between 11:12 a.m., and 11:53 a.m., revealed the following:
a. 11:12 a.m., the first floor, north core stair tower door enclosure lacked a fire-rated vision panel.
b. 11:14 a.m., non-rated, foam insulating materials within the basement-level, north core, stair tower wall enclosure.
c. 11:53 a.m., the south west, one, stair tower door was not fire-tight.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the stair tower enclosure deficiencies.
Tag No.: K0291
Based on documentation review and interview, it was determined the facility failed to maintain emergency lighting in one location, affecting two of two floors.
Findings include:
1. Observation on May 9, 2023, at 12:20 p.m., revealed the facility lacked ninety-minute bleed (or drain) testing of the battery-operated lighting fixture, located within the transfer switch room.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the emergency lighting deficiency.
Tag No.: K0353
Based on observation and interview, it was determined the facility failed to maintain the automatic sprinkler system in two locations, affecting one of two floors
Findings include:
1. Observation on May 9, 2023, between 10:07 a.m., and 12:12 p.m., revealed the following:
a. 10:07 a.m., storage items were located within eighteen inches of a sprinkler head, within the first floor, Core Storage Room.
b. 12:12 p.m., a missing escutcheon plate located within the first floor, south west, Electrical Room.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the the automatic sprinkler system deficiencies.
Tag No.: K0363
Based on observation and interview, it was determined the facility failed to maintain corridor openings, affecting one of two floors.
Findings include:
1. Observation on May 9, 2023, at 10:23 a.m., revealed in excess of one-eighth-inch between the lower level, north, Copier Room doors.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the corridor opening deficiencies.
Tag No.: K0374
Based on observation and interview, it was determined the facility failed to maintain two smoke barrier separation doors, affecting two of two floors.
Findings include:
1. Observation on May 9, 2023, between 10:47 a.m., and 12:14 p.m., revealed the following:
a. 10:47 a.m., the lower level, north, smoke barrier separation doors required adjustment to fully latch.
b. 12:14 p.m., the first floor, SR 221 smoke barrier separation door was damaged.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the smoke barrier separation door deficiencies.
Tag No.: K0918
Based on documentation review and interview, it was determined the facility failed to maintain the generator set, affecting two of two floors.
Findings include:
1. Observation on May 9, 2023, revealed the faciltiy lacked three year, four hour, generator set, load testing data.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the generator set deficiency.
Tag No.: K0919
Based on observation and interview, it was determined the facility failed to maintain the electrical system in one location, affecting one of two floors.
Findings include:
1. Observation on May 9, 2023, at 10:16 a.m., revealed items were located within thirty-six inches of electrical panels, located within the first floor, Core Storage Room.
Exit interview on May 9, 2023, between 12:35 p.m., and 12:45 p.m., with the Facilities Manager, confirmed the electrical systems deficiency.